Laboratory wastes |
Lean Laboratory aims to optimize productivity and efficiency, whilst eliminating any steps that do not add value. One aspect of Lean Laboratory is the systematic elimination of waste. The principle is to identify and then reduce or eliminate the time-wasting or unnecessary steps, in order to improve the efficiency and simplify the overall process.
Lean management describes 8 types of waste that exist in a business – independent of the industry – which do not add any value for the customer.
These 8 wastes, often described as DOWNTIME, are:
- Defects;
- Over-production;
- Waiting time;
- Not engaging all employees;
- Transportation;
- Inventory;
- Motion; and
- Extra processing.
This new guide "The Typical 8 Wastes in the Lab and How to Deal With Them" is a useful tool for lab managers. It explains what the 8 wastes are, but more importantly how to identify and eliminate these typical inefficiencies. Examples provided are based on operations using a range of benchtop laboratory equipment, such as weighing, moisture analysis, titration, pH measurement, thermal analysis, etc.
Download the guide and get:
- An explanation of the 8 Wastes of Lean Management;
- Examples of where each of these wastes occur in a typical laboratory;
- Recommendations for reducing or eliminating waste during typical laboratory operations
Simply enter your details below to download your free guide and start eliminating unnecessary steps and time-wasters in your lab today!
Waiting time
Stagnating or idle processes, missing materials, defective or unsuitable resources, can all tie up resources which cannot be used during this waiting time.
Consequences for the Lab | Weighing Example | Moisture Analysis Example | |
|
|
| |
Possible improvements |
|
|
|