SWP331D-IOL Weighing Sensor Installation Guide
Install and configure your SWP331D-IOL Weighing Sensor for seamless integration into your automation system. Mount the sensor onto the lower mounting plate, attach the upper mounting plate to the weighing platform, and connect the sensor to your IO-Link master. Use the pre-loaded factory calibration data to compensate for environmental influences, then set the Geo code to ensure accurate weighing performance.
Welcome to the installation guide for the Mettler Toledo SWP 331 D-I-O-L weighing sensor designed to fit seamlessly into your automation system. This sensor comes in three capacities, 5 kilograms, 10 kilograms and 20 kilograms. Let's get started with the mechanical installation. To install the sensor you will need 8 M4 bolts and the appropriate tools. Start by mounting the sensor onto the lower mounting plate. Ensure it is securely fixed. Next, attach the upper mounting plate to the sensor's weighing pan. The sensor uses the standard 5-pin M12 industrial cable. Connect the sensor to your IO-Link master, which connects to your PLC. This setup allows for quick and straightforward integration. No advanced expertise required. Factory calibration data is preloaded into the sensor, allowing it to adjust for environmental factors such as temperature changes. Set the GEO code to match the local acceleration due to gravity. Your weighing sensor is now ready to deliver accurate weight measurements. For detailed technical specifications and troubleshooting, please refer to the user manual on MT.com.
