When purchasing your new Mettler Toledo instrument, there are a few services that you'll need to select to get the most out of your instrument. All of the instruments are tested and inspected before they leave the manufacturing facility to make sure they meet specification. Once they reach the customer's site, the field service engineer will install it. Depending on your industry and application, a certain level of qualification will be necessary. If factory inspection is sufficient, like in academia, then the starter pack with its functional checklist is appropriate, and will trigger the start of your warranty period. If your industry or application typically requires installation and operational qualification, like in the pharmaceutical or chemical industry, then the IPac is most appropriate. This service includes on-site instrument validation and performance verification to ensure it still meets specification after installation at your site. For production or manufacturing applications with stricter quality requirements such as the FDA, GMP, and European Pharmacopoeia, the EQPac is the most appropriate. This includes a physical logbook to maintain records for all service history on the instrument. This service includes material certification for all wetted parts of the instrument or probe. It also includes validation of ICPROCESS software. Choosing the level of qualification, Starter Pack, IPAC or EQ Pack, for your instrument ensures that you meet all of your quality or regulatory requirements.
Installation Pacs
When purchasing a new METTLER TOLEDO instrument, it is critical to select the appropriate services to maximize its potential. Rest assured, all instruments are rigorously tested and inspected before leaving the manufacturing facility to guarantee they meet specifications. Depending on your industry and specific application, a certain level of qualification may be required. It is imperative to choose the appropriate StarterPac, iPac, or EQPac package for your instrument to guarantee that it satisfies all of your quality or regulatory requirements.
Watch the Installation Pacs video for more information.